Lansing: 517-887-1100  Grand Haven: 616-743-7070

August 19th Update

The Contractor has been moving along slower than anticipated while they await the delivery of concrete drainage structures from their supplier.

Work completed this week:  The Contractor installed drainage structures and perforated pipe at the intersection of Rhoda & Benjamin and have placed topsoil and seed.  The paving work to complete the restoration will be done at a later date.  Similar work was also completed at Laura Street.

Upcoming Work:  Work will continue in the areas of Lane Street, Laura Street, and Beach Street (near Laura).  Once all of the drainage structures for the project are delivered to the site progress will accelerate.